Discuss the systems concepts in Production System

  1. OBJECTIVE
    System Concept Development begins when the Concept Proposal has been formally approved and requires study and analysis that may lead to system development activities.
    The review and approval of the Concept Proposal begins the formal studies and analysis of the need in the System Concept Development Phase and begins the life cycle of an identifiable project.

    TASKS AND ACTIVITIES
    The following activities are performed as part of the System Concept Development Phase.

    PHASE ONE
    1. Study and Analyze the Business Need
    The project team, supplemented by enterprise architecture or other technical experts, if needed, should analyze all feasible technical, business process, and commercial alternatives to meeting the business need. These alternatives should then be analyzed from a life cycle cost perspective. The results of these studies should show a range of feasible alternatives based on life cycle cost, technical capability, and scheduled availability. Typically, these studies should narrow the system technical approaches to only a few potential, desirable solutions that should proceed into the subsequent life cycle phases.

    2. Plan the Project
    The project team should develop high-level (baseline) schedule, cost, and performance measures which are summarized in the System Boundary Document. These high-level estimates are further refined in subsequent phases.

    3. Form the Project Acquisition Strategy
    The acquisition strategy should be included in the SBD. The project team should determine the strategies to be used during the remainder of the project concurrently with the development of the CBA and Feasibility Study. Will the work be accomplished with available staff or do contractors need to be hired? Discuss available and projected technologies, such as reuse or Commercial Off-the-Shelf and potential contract types.

    4. Study and Analyze the Risks
    Identify any programmatic or technical risks. The risks associated with further development should also be studied. The results of these assessments should be summarized in the SBD and documented in the Risk Management Plan and CBA.

    5. Obtain Project Funding, Staff and Resources
    Estimate, justify, submit requests for, and obtain resources to execute the project in the format of the Capital Asset Plan and Justification,

    6. Document the Phase Efforts
    The results of the phase efforts are documented in the System Boundary Document, Cost Benefit Analysis, Feasibility Study, and Risk Management Plan.

    7. Review and Approval to Proceed
    The results of the phase efforts are presented to project stakeholders and decision makers together with a recommendation to (1) proceed into the next life-cycle phase, (2) continue additional conceptual phase activities, or (3) terminate the project. The emphasis of the review should be on (1) the successful accomplishment of the phase objectives, (2) the plans for the next life-cycle phase, and (3) the risks associated with moving into the next life-cycle phase. The review also addresses the availability of resources to execute the subsequent life-cycle phases. The results of the review should be documented reflecting the decision on the recommended action.

    PHASE TWO
    ROLES AND RESPONSIBILITIES
    Sponsor. The sponsor should provide direction and sufficient study resources to commence the System Concept Development Phase.
    Project Manager. The appointed project manager is charged with leading the efforts to accomplish the System Concept Development Phase tasks discussed above. The Project Manager is also responsible for reviewing the deliverables for accuracy, approving deliverables and providing status reports to management.
    Component Chief Information Officer (CIO) and Executive Review Board (ERB). The CIO/ERB approve the Systems Boundary Document. Approval allows the project to enter the Planning Phase.

    PHASE THREE
    DELIVERABLES
    The following deliverables shall be initiated during the System Concept Development Phase:

    1. System Boundary Document - Identifies the scope of a system (or capability). It should contain the high level requirements, benefits, business assumptions, and program costs and schedules. It records management decisions on the envisioned system early in its development and provides guidance on its achievement. Appendix C-2 provides a template for the Systems Boundary Document.

    2. Cost-Benefit Analysis - Provides cost or benefit information for analyzing and evaluating alternative solutions to a problem and for making decisions about initiating, as well as continuing, the development of information technology systems. The analysis should clearly indicate the cost to conform to the architectural standards in the Technical Reference Model (TRM). Appendix C-3 provides a template for the Cost-Benefit Analysis.

    3. Feasibility Study - Provides an overview of a business requirement or opportunity and determines if feasible solutions exist before full life-cycle resources are committed. Appendix C-4 provides a template for the Feasibility Study.

    4. Risk Management Plan - Identifies project risks and specifies the plans to reduce or mitigate the risks. Appendix C-5 provides a template for the Risk Management Plan.

    PHASE FOUR
    ISSUES FOR CONSIDERATION
    After the SBD is approved and a recommendation is accepted by the program and/or executive management, the system project planning begins. A number of project continuation and project approach decisions are taken by the Project Manager.

    1. ADP Position Sensitivity Analysis
    All projects must ensure that all personnel are cleared to the appropriate level before performing work on sensitive systems. Automated Data Processing (ADP) position designation analysis applies to all DOJ personnel, including contract support personnel who are nominated to fill an ADP position. ADP positions are those that require access to DOJ ADP systems or require work on management, design, development, operation, or maintenance of DOJ automated information systems. The sensitivity analysis should be conducted only to determine an individual's eligibility or continued eligibility for access to DOJ ADP systems or to unclassified sensitive information. Such an analysis is not to be construed as the sole determination of eligibility.

    2. Identification of Sensitive Systems
    Public Law 100-235, the Computer security Act of 1987, requires Federal agencies to identify systems that contain sensitive information. In general, a sensitive system is a computer system that processes, stores, or transmits sensitive-but-unclassified (SBU) data. SBU data are any information that the loss, misuse, or unauthorized access to, or modification of, could adversely affect the national interest, the conduct of DOJ programs, or the privacy to which individuals are entitled under the Privacy Act. Guidelines for the identification of sensitive systems can be found with the DOJ IMSS. These procedures will help determine the type of sensitivity level to the data that will be processed, stored, and transmitted by the new or changed system.

    3. Project Continuation Decisions
    The feasibility study and CBA confirm that the defined information management concept is significant enough to warrant an IT project with life-cycle management activities.
    The feasibility study should confirm that the information management need or opportunity is beyond the capabilities of existing systems and that developing a new system is a promising approach.
    The CBA confirms that the projected benefits of the proposed approach justify the projected resources required. The funding, personnel, and other resources shall be made available to proceed with the Planning Phase.

    PHASE REVIEW ACTIVITY
    The System Concept Development Review shall by performed at the end of this phase. The review ensures that the goals and objectives of the system are identified and that the feasibility of the system is established. Products of the System Concept Development Phase are reviewed including the budget, risk, and user requirements. This review is organized, planned, and led by the Program Manager and/or representative.
User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Discuss the systems concepts in Production System?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Give the Advantage of production system in Artificial Intelligence?

Advantages of production systems:-


What type of production system is Flexible manufacturing systems are generally applied?

Flexible manufacturing systems can be used for medium production batches,


Explain the different functions of an operating system and discuss some ways that operating systems can differ from one another?

discuss the difference function of an operating system


What are two general types of economic systems that exist today?

Capitalism and capitalism: wages system, production for use, minority ownership of the means of production.


What regulatory system controls the endocrine system?

The endocrine and nervous systems control the endocrine system. Messages from these systems cause the endocrine glands to change their production of hormones.


What are the Types of Business Information Systems?

1.sales and marketing system 2.manufacturing and production system


Why is the immune system not a part of the 11 main organ systems?

Because the components of the immune system are part of the other systems. The WBCs are part of the cardiovascular system; the production of WBCs is part of the skeletal system, etc.


What are the Functions of economic system?

The four functions of economic systems; Production, Allocation, Distribution and Regeneration.


What is economic systems jntu kakinada topics?

An economic system is a mechanism which deals with the production,distribution


What are the functions economic system?

The four functions of economic systems; Production, Allocation, Distribution and Regeneration.


What cars have navigation systems in them?

Almost every current production car is available with a nav system


What is system model?

A system model is the model that is based on concepts that represent and describe a system. Systems compromise more than one view including structure, design, implementation, and input data.