H0w Manufacturing Cycle Efficiency is measured?

Answer:

MCE =value added time (process time)/throughput time. Basically this breaks down to the time spent actually working on the product divided by the time spent working on the product, time spent on inspecting the product, time spent on moving the product and time a product spend waiting to be worked on.