By making sure the base is clean (no sharp objects like rocks or other debris.
Give the piping a uniform pitch, try to maintain 1/4" per foor.
Install a clean out if possible every 50 ft or any change of direction greater then a 45 deg
Back fill with clean fil sand is fine just as long as the back filling is free of rocks.
Tieger