Answer:
Plant Load Factor is the ratio of the actual output of a power plant over a period of time and its output if it had operated a full capacity of that time period.
Plant Load Factor = Gross Generation / (Installed Capacity * Number of Hours)
Yatendra Agrawal
Gurgaon,