It takes 133 pounds of quikrete to make 1 cubic foot, so...
- there is 0.6 cubic feet (80/133) in one 80 pound bag, and it takes one and two-thirds 80 pound bags of quikrete to make 1 cubic ft (133/80 = 1.66).
- there is 0.45 cubic feet (60/133) in one 60 pound bag, and it takes about two and one-quarter 60 pound bags of quikrete to make 1 cubic ft (133/60 = 2.22).
- there is 0.3 cubic feet (40/133) in one 40 pound bag, and it takes three and one-third 40 pound bags of quikrete to make 1 cubic ft (133/40 = 3.33).
Multiply by 27 to get cubic yards (so it would take 45 eighty pound bags to make a cubic yard).
To further help calculate how much you need for your project, you can visit the Related Link.
.022222 cu. yds
12 cubic feet, how many 80lb bags
How many cubic meters in 1 cement bag of 50kgs
80 lb bag yields about 0.6 cu ft per Quikrete specs:fNote: the question really refers to concrete not cement.
Depends how big the bag is
1.5 divided by the volume of your bag in cubic yards. 40.5 divided by the volume of your bag in cubic feet.
A 50 kg cement bag will hold about 1.3 cubic feet of dry cement powder.
There are 0.0011411411411411411 cubic yards in a 39 gallon trash bag.
volume of 1 cement bag is 0.035cu.m.
26 bags (40kgs cement bag)
42.7kg, or 94 pounds. BTW, a bag of portland cement contains one cubic foot of the product.
Imagine a cube 3' x 3' x 3' . that is a cubic yard. I believe a bag is 1/3 of a yard. No It's less than that one 94 lb bag of Portland cement is one cubic foot. And there are 27 cubic feet in a cubic yard ( 3*3*3 = 27) so an 80 lb bag of premix is a little less than 1/27th
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
0.6 cubic feet in one 80 lb bag. with there being 27 cubic feet in one cubic yard: 0.02 cubic yards per bag, in other words, it would take 45 - 80lb bags to yeild 1 cubic yard of concrete