1.19 Cubic Yards
40.1 cubic yards
3880 cubic yards
You will need 0.56 cubic yards of concrete.
9x12 feet at 4 inches deep: 1.3 cubic yards.
1.5 cubic yards of cement are needed for an 11' x 11' x 4" slab.
40.1 cubic yards
3880 cubic yards
123.44 cubic yards
0.246914 cu. yards (6.666667 cu. ft ) of concrete is needed.
16.05
You will need 0.56 cubic yards of concrete.
9x12 feet at 4 inches deep: 1.3 cubic yards.
1.5 cubic yards of cement are needed for an 11' x 11' x 4" slab.
It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
1.54321 cubic yards See the related link below
about 5 yards if your slab is 4" deep
2.2 Yards