Prime cost = direct materials + direct labor while conversion cost = direct labor + factory overhead( which includes indirect materials, indirect labor and other indirect costs
direct labor
Sum of direct materials and direct labor
Prime Cost=Direct Materials+Direct Labor Conversion Cost=Direct Labor+Factory (or Manufacturing) Overhead
Both are correct. Coversion cost = Direct Labour + Manufacturing Overhead Prime cost = Direct Labour + Direct...