cottam power station is Verry expansive power station i coast at least up to £50,000 .
A gas-fired power station takes the least time to start up.
A gas-fired power station has the shortest start up time out of all three fossil fuels
haca
digit
Geothermal power stations are built by digging into the Earth's crust and tapping into the direct heat that is never ending. It generally takes around nine months to start a geothermal power station.
Gas stations start up the quickest because they use gas turbines and do not require water to be boiled up to produce steam.
5/26/10 - They are FINALLY streaming!!
Honda power generators are expensive because of the advanced technology used in them. It always starts, runs quietly and most importantly the power is pretty clean. It also has an electric start which makes starting it so much easier.
This list shows the type of fuel in order of start of time going from short to long.gas-fired station (shortest start-up time)oil-fired stationcoal-fired stationnuclear power station (longest start-up time)However I do not know the exact time.S. T. Wilson
One disadvantage to solar power is the fact that it is expensive to have right now. Once more people start to use it the cost of using it may drop.
If you are setting up your own panels, start up cost is more expensive but this will pay off over time as it is renewable.
mansarovar station near Kamothe start Date may be in 2-3 months Will not start..