For developing systems/software that involves 10 Phases:

1. Initiation

2. System Concept Development

3. Planning

4. Requirements Analysis

5. Design

6. Development

7. Integration and Testing

8. Implementation

9. Operations and Maintenance

10. Disposition.

The Phases

Initiation - Initiation is where there is an identified need for a new system. For instance, a retailer of fine crystal glass is in need of a new system to handle inventory. They've decided that the old System of putting the inventory into a simple spreadsheet will no longer work. They want a system where they can track inventory, inventory cost, facilities cost, personnel, a customer database, can track trends in buying, identify inventory that is not moving well and price it to move, etc. In other words, they want to be able to know everything with a few clicks of the keyboard. A Project Management is placed in charge and he/she will develop a Concept Proposal - which is a document identifying the problem and why the new system needs to be pursued. The document is presented to upper management who approves it and the project moves on to the next phase.

System Concept Development - This is where the first real look at what will be necessary takes place. Several reports can be created here.

- Feasibility Study (will it work?)

- Cost/Benefit Analysis (is the cost really worth it?)

- System Boundary (how far should the project go?)

- Risk Management (what will happen if we don't do it?)

These reports are then presented, again, to the powers that be and a decision is made whether or not to go ahead. They approve the funding. If they give their approval it's on to the next phase.

Planning Phase - Who is doing what, when, and how? What personnel are needed? Use existing personnel or hire consultants? New Hardware? Develop own software or buy it off the shelf? What are the Deliverables - such as completed software programming and documentation, user manual, training, testing plans, etc? A Planning document is submitted for approval.

Requirements Analysis - Documentation of requirements. What interfaces are required (will it run with Windows NT and Windows XP?). What is the functionality required - should it be run with the mouse or keyboard commands? What is the level of proficiency required by the user? Will a new room be needed for the servers or equipment? Requirements documentation is approved, then it's on to the Design phase.

Design Phase - Take those Requirements and develop detailed, workable specifications. This is where everything is put together and the actual design of the system is done. This is also where documentation such as the Maintenance Manual, Operations Manual, and Training Manual begin. This is also where some of the flaws in the original planning may appear and require some adjustment. Again, there is documentation and approval.

Development Phase - The system is built. The software, hardware, and testing occur during the Development Stage. This is also the phase where the bugs are worked out of the system. A contingency plan is also developed at this point. A contingency plan is an emergency management document. If the power goes out - what happens to the system? What is the back up? How fast can it be brought back up to speed? Again, documentation and approval (get used to this).

Integration and Testing Phase - This is the formal integration and testing of the system. Testing has been done on the development phase, but in the Integration and Testing Phase it is a formal, documented testing procedure, not only to assure that the system performs as designed, but testing the roll-out of the system. If there is already another system in place with data, how fast can that data be migrated into the new system and useable to the company? Usually, the system is rolled-out over a weekend so that if anything goes wrong, the old system is still active and available. Integration and Testing is vital to the decision to go "live" with the new system. If it fails testing, it cannot be

trusted to work. Approval of testing and test results is necessary before the project moves into implementation.

Implementation Phase - Everything is ready and it's time to go live. Training takes place, everyone who will use the system must be fully informed of the day it goes live, previous data is migrated, and the system is ready for use. After it goes live, the system is reviewed post-implementation to see how well it worked and how well did the project go. It's often known as a debriefing or lessons learned meeting. It is also where any problems that were not crucial to the implementation can be addressed and any necessary changes to the system documented for future versions.

Operations and Maintenance Phase - Hey, it's not over. Just like a car engine, maintenance and support are necessary. What happens if the system is based on Microsoft NT 4.0 and 2 years later Microsoft is no longer supporting NT 4.0? Or, a new e-mail program is put in place and it interferes with the system? Fixes are necessary and will occur. This is the day-to-day operation of the software. No one can just walk away once the software is rolled-out and say, "Whew, glad that's over." It's not over; it's just begun.

Disposition Phase - This is where the system has become obsolete. Perhaps a whole new system is coming in, or this system cannot keep up. Many programs and systems became obsolete with the Y2K problem or with upgrades of operating systems. Whatever the reason, putting the system to bed involves more than just shutting off the server. Often, the system may be kept going due to regulatory issues or because there are still projects using it. Even if the system will be shut down due to the development of a better system, disposition needs planning. A disposition plan, archiving of system documentation, archiving of data, even a plan for getting rid of the old equipment may be a part of the Disposition Phase.

This is a short description of SDLC and its phases. The important idea to take away from SDLC is that it involves planning, approval, testing, and documentation to assure that the system can, and will work as required.

Read more: What_are_the_phases_of_SDLC

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: List and define the five major SDLC phases?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Computer Science
Related questions

What are the five phases of the sdlc?

what are the phases of the sdlc


What are the six phases of SDLC?

analyze phase


Which phases of SDLC can be sources of error?

Actually - all phases of SDLC can be a source for Errors. The later in the life cycle an error is detected, the costlier it will be to fix it


Which phases of SDLC can be sources of errors?

Actually - all phases of SDLC can be a source for Errors. The later in the life cycle an error is detected, the costlier it will be to fix it


Which phase of sdlc can be sources for errors?

Actually - all phases of SDLC can be a source for Errors. The later in the life cycle an error is detected, the costlier it will be to fix it


What are the major differences between PDLC and SDLC?

See the graph in the related link. It clearly separates out the differences between PDLC and SDLC.


Which phases of SDLC can be source of errors?

Preliminary Analysis:Failure to correctly define the objectivesSystems analysis, requirements definition:Failure to correctly define requirements - often by failing to get full input from all stakeholdersSystems Design:Design errors where requirements are not properly accounted forDevelopment:Coding errorsTesting and integration:Incomplete testing for functionality and integrationALL PHASES:Failure to implement and follow a change management process


Systems Development Life Cycle on library management system?

The SDLC has 4 phases that are used when developing a library management system. Those phases are planning and selection, analysis, design, and implementation.


What is the important of sdlc?

SDLC or System Development Life Cycle is important because it describes the phases that a program developer has to follow to ensure success. The cycle consists of between four and seven steps that a programmer should adhere to in his work.


What are the advantage and disadvantage of system development life cycle?

Advantages The project mangers and programmers will able to communicate to each other Components will be easier to define Uncompleted products can be passes on to another person when necessary


In the nine-phase approach to the SDLC defining functional and technical requirements reviewing the list and getting approval is completed during the phase of the SDLC?

Requirements analysis phase


What are the advantages of life cycle?

There are number of SDLC models in software engineering. Using life cycle model we can divide the work in different phases thus making it easy and convenient .