In workplace health and safety, a baseline study is one that looks at study characteristics at a particular time or under a particular set of conditions to establish a "base line." This could be the incidence rate of a particular condition, the airborne concentration of a contaminant, or any of a number of other items.
Subsequent studies of the same or similar workplaces at different times or under different circumstances will be conducted to see if there are changes as compared to that "base line." Then the researcher will attempt to determine whether the changes were related to any of the differing circumstances.
After creating a schedule, the initial state is saved as a baseline. As the schedule is updated, it can then be compared to the baseline to see how far the schedule is behind/ahead of the original estimate. This information can then be used to better estimate future schedules.
A baseline score is usually the first in a series of scores on the same test. The subsequent scores are compared to the first (baseline) score to measure how much the test-taker has improved (or possibly declined) since the first test.
Systematic gathering of data for a particular purpose from various sources, including questionnaires, interviews, observation, existing records, and electronic devices. The process is usually preliminary to statistical analysis of the data.
schedule baseline is also referred to as a target schedule. It is a vetted copy of the initial project baseline, used to review the project performance, and report any variances in the schedule. Furthermore, it creates a path for other relevant project management documents like cost baseline, mobilization plans, and resource allocation plans.
Austin and Mark Best Friends 4-Life
Baseline dimensioning is use in engineering referring to the lines that give you the dimensions of the object.
In Cebu (measurement), it were "Dupa, Caltex, and Lapad".
There are plenty of ways in which educational measurement and evaluation can be defined. Educational measurement and evaluation is basically the testing of what someone knows or has learned.
the physical measurement are those already made items.e.g the themoscope for the doctors,tape etc. While the educational measurement are those instrument used by the teacher in the school.e.g test etc.Glory Ben
Schedule Scope Cost
The first step in developing a Performance Measurement Baseline is to define or scope all work involved.
1. Schedule 2. Cost 3. Scope
schedule the work
Schedule Cost Scope
Better depth perception.
A baseliner is a tennis player who seldom moves towards the net, preferring to play near the baseline.
There was a baseline for software construction in company. This is an example sentence containing baseline word.
the performance measurement baseline consists of
-Scope -Cost Performance -Schedule
Schedule Scope Cost