Concurrent Engineering, basically breaks activities into smaller segments so that work can be done in parallel and the project expedited. Start-to-start relationships can depict the concurrent engineering conditions and reduce network detail. Of course, the same result can be accomplished by breaking an activity into small packages that can be implemented in parallel, but this latter approach increases the network and tracking detail significantly.
-Project managers need a method for identifying changes -Project managers should implement only approved changes -Project managers' main activity in change control is reviewing, assessing, and deciding on change requests -Project managers must address changes promptly.
This is an embracing term that includes all engineering design and other activities for an engineering project. It starts from the project brief and works through to the visualisation, conceptualisation and definition stages. It involves translating the client's needs into a conceptual design and then a basic design. It helps determine feasibility and initial project cost estimates.
The Ishikawa diagram is one of the seven basic tools for quality control. The Ishikawa diagram is used to know why something has happened or why something will happen in a project. Excellent tool for Project Managers.
-Sponsor: articulates re-engineering goals. -Steering Committee: oversees the re-engineering project, reviews status, identifies concerns. -Design Teams: develop new processes. Champion: keeps sponsor informed, coordinates design team activities.
To effectively use and extract information from engineering drawings and related specifications, one must first develop a strong understanding of the various symbols, notations, and dimensions utilized in these documents. This knowledge, combined with a systematic approach to examining each drawing and specification, will allow for the accurate interpretation of design intent, materials, and measurements, ultimately enabling the successful execution of the project at hand.
The relationship between project managers and line managers is that the project managers divide the work among the line managers and the line managers report to the project managers.
As a construction project manager, they need to have a Bachelors degree in engineering or business administration. Strong communication and customer service skills is a must for this position.
advantage: applicable all types of s\w.... to give accurate picture of current project... easy to understand.... easy to use.......
Project Managers
-Project managers need a method for identifying changes -Project managers should implement only approved changes -Project managers' main activity in change control is reviewing, assessing, and deciding on change requests -Project managers must address changes promptly.
Project managers and project management teams, project sponsors
Either current Project Managers or would be Project Managers (such as system analysts, senior developers, etc...)
Easiest approach is to copy and paste a past project, then edit as you read along and claim ownership of work
In general terms, software which is using by Project Managers is called as Project manager Software. There are many types of useful software available for project managers according to their industry and work systems. Software like JIRA, HADOOP etc are also using by Project Managers.
In general terms, software which is using by Project Managers is called as Project manager Software. There are many types of useful software available for project managers according to their industry and work systems. Software like JIRA, HADOOP etc are also using by Project Managers.
Yes. They are one of the most important members of a project.
The project is initiated by upper-level managers who issue policy, procedures and processes, dictate the goals and expect outcomes, and determine accountability for each required action.