The strength of M20 concrete for 7days will be 63%( say 12.6) of 28days strength i.e. 20N/sq mm

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the M 20 concrete strength for 7 days?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Engineering

What is the strength of concrete after 28 days?

The compressive strength of M25 concrete at 7 days will be between 6-7.5 N/mm2 .


How many days concrete has to be cured prior to steel erection What counts days or strength achieved by concrete?

the strength that it has gained is the main thing, but usually 5 to 7 days as a rough guide.


What is the compressive strength of M35 concrete at 28 days?

35N/mm2 actually, the '35' respresents the characteristic design strength of the concrete. this strength is pivotal in design as its the 'lowest fair estimate' of strength.in reality tere is a margin for error (between 5-10MPa)and a 5% defectives built in to a normal probability curve.in my latest research i have found that in some cases the characteristic design strength (in your case 35MPa) can almost be underestimated by 20%.the importance is on-site testing, but as previously stated, if you design to 35MPa... you are definitely on the safe side of concretes inevitable variability


How many days required for concrete curing?

That depends on the concrete, as well as weather conditions, and the load the concrete would be subjected to. Concrete gains strength over time and the usual benchmarks are 7 days, and 28 days. At 28 days concrete has usually cured to nearly its maximum strength. For a concrete footing in a residential environment say a deck or home the concrete will usually cure for a minimum of three days before the formwork is removed and the rest of the structure is built. For a commercial or civil project the curing is subject to the engineers discretion.


What is the minimum characteristic strength for 7 day concrete cube?

67%

Related questions

What is the strength of concrete after 28 days?

The compressive strength of M25 concrete at 7 days will be between 6-7.5 N/mm2 .


How many days concrete has to be cured prior to steel erection What counts days or strength achieved by concrete?

the strength that it has gained is the main thing, but usually 5 to 7 days as a rough guide.


What is the compressive strength of M10 concrete at 7 days?

The compressive strength of M20 concrete at 28 days typically falls in the range of 20 to 25 megapascals (MPa), which is equivalent to 2900 to 3600 pounds per square inch (psi). M20 is a mix designation for concrete, where "M" stands for "mix" and the number 20 represents the characteristic compressive strength of the concrete mix in MPa. Please note that the actual compressive strength of M20 concrete can vary depending on several factors, including the quality of materials used, the water-cement ratio, the curing conditions, and the testing procedures. To ensure the desired strength, it's essential to follow the recommended mix proportions and proper construction practices during the preparation, placing, and curing of the concrete. Additionally, testing of concrete samples is typically conducted in a laboratory environment to determine the 28-day compressive strength accurately.


What is the strength of M-30 after 7 days?

Seven days strength of any concrete usually comes 67% of 28 day strength. So 7 day strength of M30 may be .67*30=20.10 MPa


Why is the 28-days compressive strength of concrete generally specified?

It is attributed to two reasons: 1. Strength of concrete grows faster in initial days and this process of gaining strength slow down with time. This can be said as stabilization in value of gained strength of concrete. After approximately 20 or some more days, strength value get stabilize and does not change too much with time. Therefore, compressive strength is taken after approximatley 3 weeks time. 2. These tests have to performed practically and date record is needed to be maintained. Therefore, if test duration is a multiple of 7 (7 weekdays) then it is more easy to remind. It is the reason we have 28=7x4 days to note down compressive strength of concrete. for ex: if we start test on monday then we know that after 4 weeks on same time on monday we can finish the compressive strength test.


Why 7 days compressive strength is concider?

concrete strenght gain at first 7 days much increase so we consider 7days strenght


What is strenGth of M-30 after 30 days?

Seven days strength of any concrete usually comes 67% of 28 day strength. So 7 day strength of M30 may be .67*30=20.10 MPa


Can bottom forms be remove if strength required is attained in 7 days?

In reference to concrete, bottom forms can be removed once the item is dried and set. After 7 days, strength is built in the product and it is able to be used without bottom support forms.


What is the compressive strength of M35 concrete at 28 days?

35N/mm2 actually, the '35' respresents the characteristic design strength of the concrete. this strength is pivotal in design as its the 'lowest fair estimate' of strength.in reality tere is a margin for error (between 5-10MPa)and a 5% defectives built in to a normal probability curve.in my latest research i have found that in some cases the characteristic design strength (in your case 35MPa) can almost be underestimated by 20%.the importance is on-site testing, but as previously stated, if you design to 35MPa... you are definitely on the safe side of concretes inevitable variability


How do check the mixdesign for concrete is correct or not?

for checking the mix design for concrete, we need to initially prepare the mix n take samples n do cube tests to find the compressive strength n find out if desired strength is obtained for 7 days & 28 days strength. if desired strength is not obtained v need to adjust the mix proportions. its actually a trial n error method.


How many days required for concrete curing?

That depends on the concrete, as well as weather conditions, and the load the concrete would be subjected to. Concrete gains strength over time and the usual benchmarks are 7 days, and 28 days. At 28 days concrete has usually cured to nearly its maximum strength. For a concrete footing in a residential environment say a deck or home the concrete will usually cure for a minimum of three days before the formwork is removed and the rest of the structure is built. For a commercial or civil project the curing is subject to the engineers discretion.


What is the minimum characteristic strength for 7 day concrete cube?

67%