answersLogoWhite

0


Best Answer

M25 - M40 can be used..

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the grade of concrete is used for bridge construction?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What construction method was used to build the London Bridge?

The current (1973) bridge is a pre-stressed concrete box girder bridge


What are the most common materials used in bridge buliding?

iron, steel, concrete, stone, wood, and composites are the most common materials used in bridge construction!


What technology was used to build the Sydney harbor Bridge?

Go to the Link Below (History of the Sydney Harbour Bridge) for a brief description of the bridge and the technology employed in its construction and design>


What was the total weight of concrete for tower bridge?

There was virtually no wire used in the construction of Tower Bridge. Its main components are 70,000 tons of concrete, 11,000 tons of steel and it is clad in Cornish granite and Portland stone.


Concrete grade M 30?

What is mixing ratio for concrete grade 30


What material was used in the construction of The Richmond Bridge?

The "Richmond Bridge" London, England. The design is a stone arch bridge constructed of Portland stone, construction started 1774 and completed 1777.The "Richmond Bridge" Richmond, Tasmania. The original name was "Bigge's Bridge and was constructed of sandstone, construction started in 1823 and completed in 1825.


What is M20 concrete grade?

M20 refers to the grade of the concrete generally used in construction purpose. Here, M refers to mix & number 20 refers to the characteristic strength of concrete. the proportions of this grade is (1:1 1/2: 3). Along with this there are some more grades used in constructions i.e., M5, M7.5, M10, M15, M25, M30................. M80


How much a square meter of concrete?

Concrete is sold in cubic (volume) measurements not square (area) measurements.


What materials is used to make London bridge?

The current London Bridge is a pre-stressed concrete box girder bridge.


What are the materials used in the London bridge?

The present London Bridge is built using pre-stressed concrete.


How much concrete was used to build the millau bridge?

The volume of concrete used to build the Millau bridge is 85,000 m3 (cubic meters). The weight of this volume of concrete is 206,000 metric tons.


What material where used to build the London bridge?

The present bridge is a pre-stressed concrete box girder bridge.