answersLogoWhite

0


Best Answer
  • The Great Kersten Blunder. (Kersten was the programer that made the error). The Vigor space probe was sent towards Venus, but because of a computer programing error installed on it, a convertion from millimeters to inches was incorrect. It divided by 24.5 instead of 25.4. This error caused it to miss Venus completely and was sent hurling into space. Over 2 billion dollars of technology was lost because of one simple error.
  • The Mars Climate Orbiter had a problem when trajectory programming teams from Europe and USA were working in two different measurement systems, imperial and metric. It missed the planet completely and was lost.
  • Not exactly engineering but it was an aviation blunder. An Air Canada flight was fuelled in Toronto using pounds instead of liters of fuel. The pilot calculated how much he needed thinking he was getting his fuel in liters and eventually ran out of fuel near Winnipeg. He successfully landed the plane safely at a semi-abandoned WW2 airstrip at Gimli Manitoba.
  • The Hubble Space Telescope or HST originally had an incorredtly ground mirror (Link below.)
User Avatar

Wiki User

12y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

14y ago

some major engineering blunders that were results of faulty measurements were that people had the wrong information,didnt know if it was right or wrong.

This answer is:
User Avatar

User Avatar

Wiki User

11y ago

the iffel tower is 6 inches shorter all because the construction bulider read the measurments wrong

This answer is:
User Avatar

User Avatar

Wiki User

13y ago

NASA lost 600billion dollars because they measured in chodes

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What major engineering blunders were result of faulty measurements?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What problems could result from incorrectly converting measurements from one system to another?

blunders in technology


Which major engineering blunders throughout history were the result of faulty measurements?

I've not comfirmed these yet, but I have a feeling that there was a possibility of the Channel Tunnel, which was dug from each side toward the middle, not meeting properly at one point.Isn't there also something about the Space Shuttle booster rockets' O-rings and a mix up with metric and imperial units?And then there's the main reflector on the Hubble Space Telescope which was incorrectly ground and had to be subsequently corrected.And, of course, who could forget Spinal Tap's stage props for the song 'Stonehenge' being completely wrong? (Like I just did). Not exactly engineering though - see links.


What major engineering blunder were the result of faulty measurement?

So far, no one has identified any major errors that were the results of faulty measurement.Two common misconceptions are actually errors of a different sort -- the Mars Climate Orbiter and the Hubble Space Telescope.


Is aids The result of a faulty immune system?

No it is not.


What can you do to prevent your Chrysler dashboard from cracking?

There is no certain way to prevent your Chrysler dashboard from cracking. The cracking is typically a result of a defective plastic being used to make the dashboard, a faulty manufacturing process, or an engineering flaw.


What is engineering cut off mark for jamb result?

Cut off mark for engineering


How do faulty construction practices lead to loss of life?

Faulty construction practices can result in major loss of life. This is because faulty buildings may collapse, or easily flood, or even move in a landslide.


What percent of congenital disorder are a result of harmful genes or faulty chromosomes?

About 30%


The term used to describe how consistently several measurements of the same quantity give the same result is?

the term used to describe how consistently several measurements of the same quantity give same result is


How is the precision is of a calculated result to the precision the measurements used in the calculator?

The precision of a calculated answer is limited by the least precise measurements used in the calculation.


Why is it important that you make accurate measurements in science?

Because if the measurements is just a little bit off, the result can become terribly wrong.


How is the precision of a calculated result related to the precision of the measurements in the calculations?

The precision of a calculated answer is limited by the least precise measurements used in the calculation.